Vincent Weeda

Vincent Weeda

Performance Analysis Group ProRail

V.A. Weeda MSc, born 1979 in Amsterdam, married and two sons. Graduated 2005 at Delft University of Technology, Faculty of Civil Engineering and Geosciences, Department of Transport and Planning. 2003 Internal Placement at National Express, London. 2005-2007 Research and Education at Delft University of Technology, and still involved in education there as a guest-lecturer and supervisor of Master interns at ProRail.
 
Since 2007 Performance analyst and consultant at Dutch Infra Manager ProRail. Extensive experience with in-depth train traffic analyses and improvement projects, in close co-operation with Train Operating Companies. Closely involved in establishing feedback loops between scheduling and operations, in order to continuously improve punctuality, capacity, safety and energy efficiency.
 
Board member of Dutch-Belgian transport & spatial planning congress CVS. Participated in railway company exchanges to Japan, Switzerland, Germany and the UK, published on various international railway conferences.
 

Time and date Venue Topic Speakers

Wednesday 10/04/2019

From 12:15 To 12:40

04/10/2019 12:15 04/10/2019 12:40 Achieving High Punctuality Through Operations Analysis Of The Rail Timetable
  • Increasing punctuality of Dutch passenger traffic in 2018 to an all-time record of 91,5% within 3 minutes
  • Continuous improvement through permanent delay analysis together with operators
  • Towards the future: addressing the timetable design process by scheduling in tenths of minutes, and a feedback loop on the running time calculation.
  • Creating a sustainable timetable to accommodate the growing number of trains on the network.
Conference Station, Hall B

Conference Station, Hall B

"Achieving High Punctuality Through Operations Analysis Of The Rail Timetable"

Vincent Weeda
Time and date

Wednesday 10/04/2019

From 12:15 To 12:40

04/10/2019 12:15 04/10/2019 12:40 Achieving High Punctuality Through Operations Analysis Of The Rail Timetable
  • Increasing punctuality of Dutch passenger traffic in 2018 to an all-time record of 91,5% within 3 minutes
  • Continuous improvement through permanent delay analysis together with operators
  • Towards the future: addressing the timetable design process by scheduling in tenths of minutes, and a feedback loop on the running time calculation.
  • Creating a sustainable timetable to accommodate the growing number of trains on the network.